Dumpit Scotland · How pricing works
Van & Load Size Guide
We price by the space your waste fills in the lorry, not by the hour and not by the item. Here is exactly what each load size looks like in real furniture, real bin bags and real rooms, so you can work out your price before you even message us.
Mobile or WhatsApp: 07888 999 715
The four load sizes
What actually fits in each one
Our lorries are caged tippers, so a full load is roughly 12 cubic yards — about the same as a builder's skip, except we do the loading and nothing sits on your street.
1/4 Load — £160 + VAT
About 25 bin bags of space.
- A three-seater sofa on its own
- A fridge-freezer and a washing machine
- One bedroom emptied of furniture
- A small shed's contents
- A bathroom strip-out
- 25 to 30 filled bin bags
1/2 Load — £290 + VAT
Roughly a single-car garage.
- A three-piece suite
- A typical garage clear-out
- A garden's worth of green waste and old fencing
- A small office's desks and chairs
- A kitchen strip-out including units
- 50 to 60 filled bin bags
3/4 Load — £390 + VAT
Most of a flat.
- A one-bed flat cleared to the walls
- A large double garage
- A full office floor's furniture
- A loft plus a garage together
- A shop unit's fittings
- A conservatory dismantled
Full Load — £550 + VAT
About a 12-yard builder's skip.
- A three-bed house clearance
- A full commercial unit
- A large site or strip-out clearance
- A hoarded property, one load of several
- An estate or probate clearance
- Roughly 12 cubic yards of space
How to estimate yours
Three ways to work it out in under a minute
Count bin bags
The most reliable method for bagged waste. Around 25 filled bin bags is a quarter load, 50 to 60 is a half, and so on. Bags are a good unit because they are all roughly the same size regardless of what is in them.
Count the furniture
For clearances, think in rooms rather than items. One bedroom stripped to the walls is about a quarter load. A living room with a suite in it is about a half. A whole one-bed flat is about three quarters, and a three-bed house is a full load or more.
Compare it to a skip
If you have hired skips before, the maths is easy: a full load is about a 12-yard skip, three quarters is about an 8-yard, a half is roughly a 6-yard and a quarter is around a 4-yard mini skip. The difference is that we load it, there is no permit and it leaves the same day. That comparison is worked through in more detail on our skip hire alternative page.
Or just send a photo
Honestly the fastest option. Stand back far enough to get the whole pile in frame, send it on WhatsApp, and we will tell you the load size and the fixed price, usually within the hour. See the full price list for what each size costs.
Mobile or WhatsApp: 07888 999 715
The one exception
Heavy waste is weighed, not measured
Soil, rubble, concrete, bricks and hardcore are all charged by weight at £149 per tonne rather than by load size. This is not a way of charging more — it is a legal weight limit. A caged lorry filled to the top with rubble would be well over its permitted axle weight and illegal to drive, so inert (the heavy stuff — rubble, concrete, brick and soil) material is loaded to weight and priced accordingly. As a rule of thumb, 25 rubble sacks is about a tonne. See concrete and rubble removal or soil and muck away for how those jobs work.
Transparent pricing
Honest prices. No hidden fees.
- All-inclusive pricing
- No call-out charges
- Upfront quotes, always
- Pay by card or cash
Smaller jobs start at £100 + VAT for a 1/8 load — these four are the sizes we are asked for most.
| Load size | Ideal for | From price |
|---|---|---|
| 1/4 Load | Small items, single rooms | £160 + VAT |
| 1/2 Load | Bigger clearances | £290 + VAT |
| 3/4 Load | Large clearances | £390 + VAT |
| Full Load | Full house & large jobs | £550 + VAT |
Heavy waste like soil and rubble is charged by weight at £149 per tonne (25 rubble sacks = 1 tonne). Heavy mixed waste loads incur a £250 supplement, and extra crew time is £50 + VAT per half hour. Full load-by-load list on the prices page.
from £550 + VAT
Questions
Frequently asked questions
Count bin bags if it is bagged, or count furniture if it is not. Roughly 25 filled bin bags is a quarter load. A three-piece suite is about half a load. A bedroom emptied to the walls is about three quarters. If in doubt, send a photo — it takes us under a minute to tell you.
We run caged tipper lorries rather than transit vans. A full load is roughly 12 cubic yards, which is about the same as a builder's skip, but we load it for you and there is no permit or hire period.
Volume, for everything except heavy inert material. Soil, rubble, concrete and hardcore are charged by weight at £149 per tonne because they hit the lorry's legal weight limit long before they fill the cage.
We tell you before we load, not after. If the pile is bigger than the photo showed, you get the revised price up front and decide. Most of the time the crew simply takes it and the price moves to the next band.
Yes. Larger house clearances and site jobs often run to two or three loads, and multiple loads are quoted as one job rather than repeatedly at the single-load rate.
A full load is about the same volume as a 12-yard skip. The differences are that we do the loading, there is no permit for road placement, nothing sits outside your house for a week, and nobody else fills it overnight.
Not sure of your load size? Send a photo
Tell us what needs cleared and we will reply with a fixed, no-obligation price. To share photos, use WhatsApp.

