Why the steel changes things
Reinforced concrete is two materials in one: a concrete matrix and a steel reinforcement cage. Both are recyclable, but they have to be separated first, and that is what makes processing it different from plain rubble.
At a recycling facility the concrete is crushed and the liberated steel is pulled out by overband magnets. The steel goes to metal recycling and the crushed concrete becomes recycled aggregate — used as sub-base for roads, foundations and hardstanding.
Both outputs have genuine value, which is why concrete recycling is one of the better-established recovery routes in construction. What it does need is the right facility; it is not something to attempt to separate by hand on site.
- Rebar must be separated before crushing
- Magnetic separation does it at the plant
- Steel is recovered and recycled
- Concrete is crushed to aggregate
- Both streams have value
- Weight, not volume, sets the price
Getting it out
Breaking reinforced concrete is heavy work. A hand-held breaker deals with thin slabs and paths; anything structural — foundations, lintels, columns, thick slabs — needs a machine and, in many cases, cutting the rebar with a disc cutter as you go.
The safety issues are real: silica dust from cutting and breaking, flying fragments, and the reinforcement itself, which springs and has sharp ends. Water suppression or on-tool extraction for the dust, full eye protection, and gloves that cope with cut steel.
Before breaking anything structural, establish that it is not load-bearing. That sounds obvious and it is the single most expensive mistake made on domestic projects — a structural engineer's opinion is cheap by comparison.
Broken out and in a pile?
That's the cheap version — weighed at £149 a tonne rather than filling a lorry by volume.
Why it's priced by weight
Concrete is dense. A cubic metre is around 2.4 tonnes, which means a lorry reaches its legal weight limit long before it looks anywhere near full. Charging by volume for concrete would be charging you for space nobody can use.
So inert (the heavy stuff — rubble, concrete, brick and soil) material — concrete, rubble, brick, hardcore, stone and soil — is priced by weight instead. Ours is £149 per tonne, and as a rule of thumb 25 rubble sacks is about a tonne.
Keeping it separate from general waste is the practical advice. Mixed into a general load it takes up volume you pay for and can trigger the £250 heavy mixed load supplement. Broken out into a pile of its own, it is charged by weight and usually costs less than people expect.
A note on RAAC
Reinforced autoclaved aerated concrete — RAAC — is a lightweight panel material used in roofs, floors and walls in buildings constructed roughly between the 1950s and the mid-1990s. It is not the same as ordinary reinforced concrete and it has been the subject of significant structural concern.
It is much lighter and more porous than normal concrete, with a bubbly texture, and it degrades in ways that are not always visible from below. If you suspect RAAC in a building, that is a structural engineer's assessment before anything else happens, not a demolition decision.
It is worth mentioning here because it is the one situation where 'it's just concrete' is not a safe assumption. In an ordinary domestic slab, path or foundation, it is not a consideration — see concrete removal for the routine version.