Check the registration first
Everything starts with the SEPA public register of waste carriers and brokers. It is free, it takes under a minute, and it is the only thing that actually verifies a contractor is authorised to move your waste. Ask for the registration number, look it up, and check the registered name matches the name on the quote and the invoice.
Mismatches are more common than you would expect and they matter. Waste collected by a company that is not the registered entity is not covered by that registration, and under the duty of care (your legal responsibility for waste you produce) that is your problem as much as theirs.
For the record ours is WCR/R/3002381, trading since 2010, company number SC516270. Any contractor should give you theirs without hesitation. Reluctance is the answer to the question.
- Look them up on SEPA's public register
- Match the registered name to the invoice name
- Confirm what classifications they can carry
- Ask for public liability cover in writing
- Check they can work your shift pattern
- Confirm a transfer note for every load
Ask what they cannot take
This is the most revealing question you can ask an industrial waste contractor, because a good one has a clear answer and a bad one does not. Waste carrier registrations are not unlimited. General and non-hazardous waste is one authorisation; special waste — Scotland's term for hazardous waste — is another entirely, and it moves on consignment notes pre-notified to SEPA rather than on ordinary transfer notes.
A contractor who says 'we'll take anything' on an industrial site is either not thinking or not telling the truth. Real sites have chemical drums, process liquids, contaminated absorbents, gas cylinders and sometimes asbestos, and none of those move on a general waste registration.
We are explicit about it: we carry non-hazardous industrial waste and we do not carry special waste. What that means in practice is on our hazardous and special waste page, and it is why we tell customers what needs a specialist before quoting rather than after arriving.
Can they actually work your site
Industrial clearance is rarely a nine-to-five job. Most of it happens during planned shutdowns, at weekends, or on nights between shifts, because production does not stop for a waste contractor. Ask directly whether they work those hours as a matter of routine or as an exception with a surcharge attached.
Then ask the practical questions: can they provide risk assessments and method statements, do the crew hold the site inductions or PPE your site requires, and what is their public liability cover. On a live industrial site those are not formalities — they are what determines whether the crew gets through the gate on the day.
Access and equipment matter too. A contractor who only owns transit vans will struggle with racking, machinery bases and full-lorry volumes. We run caged tipper lorries and price by volume, which is why a full load is £550 + VAT rather than an open-ended day rate.
Shutdown or weekend work coming up?
Give us the dates and we will work round production rather than through it.
The paperwork test
Confirm before you book what documentation you will receive and when. The baseline is a waste transfer note for every load, describing the waste and its EWC code, the quantity, the destination and the carrier's registration. Not one note at the start of a relationship — one per collection.
For anything more than routine, ask about diversion figures. If your site reports on landfill diversion for ISO 14001, a customer audit or a tender, you need the numbers rather than an assurance, and they should come from weights on the transfer notes rather than an estimate. That is also the raw material for an industrial waste audit.
Finally, get the price mechanism in writing. Volume-based, weight-based or day rate — all three are legitimate, but they behave very differently on a job that turns out bigger than expected. Ours is volume for general waste and £149 per tonne for heavy inert (the heavy stuff — rubble, concrete, brick and soil) material, confirmed from photographs before we mobilise. See industrial waste removal for how a typical job runs.
Red flags worth walking away from
Four things should end a conversation with an industrial waste contractor. The first is reluctance to give a registration number, or a number that does not match the trading name when you look it up. The second is an offer to take special waste — drums, process liquids, asbestos — without mentioning consignment notes.
The third is cash-only pricing with no paperwork. Under the duty of care the absence of a transfer note is your compliance problem as well as theirs, and a contractor who does not issue them is telling you something about where the waste is going.
The fourth is a price that is substantially below everybody else's for the same work. Legitimate disposal has a floor cost set by gate fees at licensed facilities, and a quote well underneath that floor usually means the waste is not reaching one. That is how businesses end up named in a fly-tipping investigation for waste they thought they had disposed of properly — the mechanics are in our guide to fly-tipping penalties in Scotland.


